Hell must have frozen over, the long awaited auditorium remodels have begun. I’ve been told it’ll take a year, with the initial goal of having rooms 1 and 2 (IMAX) complete by Spring 2019. Staff thinks all rooms will get recliners, but aren’t 100% sure, given that some of the smaller rooms would be left with less than 50 seats as a result.
Hell must have frozen over, the long awaited auditorium remodels have begun. I’ve been told it’ll take a year, with the initial goal of having rooms 1 and 2 (IMAX) complete by Spring 2019. Staff thinks all rooms will get recliners, but aren’t 100% sure, given that some of the smaller rooms would be left with less than 50 seats as a result.