MAIN OUTER LOBBY ENTRANCE GG THEATRE
Uploaded By
Featured Theater
More Photos
Photo Info
Taken on: August 25, 2018
Uploaded on: August 25, 2018
Exposure: 1/250 sec, f/7.9, ISO 800
Camera: Canon Canon PowerShot A1300
Size: 972.2 KB
Views: 698
Full EXIF: View all
Digital zoom ratio: 0
Aperture value: 191/32
F number: 79/10
Focal plane y resolution: 864000/91
Pixel Y dimension: 1728
Date time original: Sat Aug 25 19:03:16 +0000 2018
Y resolution: 180
Resolution unit: 2
Focal plane resolution unit: 2
Flash: 16
YCbCr positioning: 2
Focal length: 5
Date time digitized: Sat Aug 25 19:03:16 +0000 2018
Scene capture type: 0
Exposure bias value: 0
Custom rendered: 0
Image description:
Max aperture value: 95/32
ISO speed ratings: 800
Exposure mode: 0
Compressed bits per pixel: 3
Make: Canon
Date time: Sat Aug 25 19:03:16 +0000 2018
Sensing method: 2
Color space: 1
Focal plane x resolution: 1152000/121
Shutter speed value: 255/32
Exposure time: 1/250
User comment:
White balance: 0
Model: Canon PowerShot A1300
Pixel X dimension: 2304
Metering mode: 5
X resolution: 180
Let’s see what color paint they decide to put on the front doors. Please not Brown paint again.
No one has favorited this photo yet
Comments (1)
I guess the re model people will wait till the last week before re opening in mid Sept 2018 to polish up the classic ever leaking terrazzo entrance were the boxoffice once stood. This fake front was put up when the did a mini remodel after the Cinerama 70mm people people left and It became a legit house with the opening of Chorus Line. Working at a local TV station then I did a small news feature on the re opening.