Ongoing works

Uploaded By

Tiny Zappomatic

Featured Theater

More Photos

Photo Info

Taken on: February 24, 2018

Uploaded on: February 24, 2018

Exposure: 1/17 sec, f/1.8, ISO 64

Camera: Apple iPhone 7

Software: Photos 3.0

GPS: 51° 30' 39" N, 0° 7' 51" W Staticmap?center=51

Size: 1.7 MB

Views: 962

Full EXIF: View all

F number: 9/5

Aperture value: 2159/1273

GPS speed: 0

GPS latitude: 5130998/25

GPS dest bearing: 31017/116

Date time original: Sat Feb 24 14:27:55 +0000 2018

Pixel Y dimension: 4032

Tile width: 512

Y resolution: 72

Resolution unit: 2

Subsec time orginal: 224

Brightness value: 4976/2351

Exposure program: 2

Flash: 16

Focal length in 35mm film: 28

GPS longitude ref: W

Date time digitized: Sat Feb 24 14:27:55 +0000 2018

Focal length: 399/100

Tile length: 512

Scene capture type: 0

Exposure bias value: 0

Subsec time digitized: 224

GPS longitude: 071271/25

Subject area: 2015151122171330

Software: Photos 3.0

ISO speed ratings: 64

GPS altitude ref:

License:

Ongoing works

Ongoing refurbishment works. The gap in the ceiling has been covered with some temporary material and the wooden pelmet is beginning to extend around the foyer.

Unfavorite No one has favorited this photo yet

You must login before making a comment.

New Comment