Ongoing works

Uploaded By

Tiny Zappomatic

Featured Theater

More Photos

Photo Info

Taken on: February 24, 2018

Uploaded on: February 24, 2018

Exposure: 1/17 sec, f/1.8, ISO 100

Camera: Apple iPhone 7

Software: Photos 3.0

GPS: 51° 30' 39" N, 0° 7' 51" W Staticmap?center=51

Size: 2.3 MB

Views: 954

Full EXIF: View all

F number: 9/5

Aperture value: 2159/1273

GPS speed: 0

GPS latitude: 51301987/50

GPS dest bearing: 5946/43

Date time original: Sat Feb 24 14:28:15 +0000 2018

Pixel Y dimension: 4032

Tile width: 512

Y resolution: 72

Resolution unit: 2

Subsec time orginal: 301

Brightness value: 18356/13847

Exposure program: 2

Flash: 16

Focal length in 35mm film: 28

GPS longitude ref: W

Date time digitized: Sat Feb 24 14:28:15 +0000 2018

Focal length: 399/100

Tile length: 512

Scene capture type: 0

Exposure bias value: 0

Subsec time digitized: 301

GPS longitude: 071271/25

Subject area: 2015151122171330

Software: Photos 3.0

ISO speed ratings: 100

GPS altitude ref:

License:

Ongoing works

Ongoing refurbishment works. The gap in the ceiling has been covered with some temporary material and the wooden pelmet is beginning to extend around the foyer, and some wire trough has appeared.

Unfavorite No one has favorited this photo yet

You must login before making a comment.

New Comment